Overengineering

December 4, 2012

“Overengineering” is anathema to most product manufacturers. Generally, manufacturers desire to put no more time and money into a product than is necessary. They decide upon a reasonable lifespan for a product, and then they use materials and parts that, with rare exception, have been proven to last that long.  They do not care to produce a product that lasts longer than the consumer desires; they do not want to invest resources where they won’t see a return.

An exception to this general rule is invoked by those manufacturing products which, if they break, will kill or maim people.  Airplanes are the classic example:  they’re built with multiple redundancies and with materials and parts that have been tested to last much longer than necessary. The potential for catastrophic loss of life demands this. They will use a part that’s tested to last 20 years, and replace it after ten years just to be safe.

I suspect that some observers of the MHSAA’s recent campaign to increase sports safety training for coaches and modify playing rules that may endanger participants are critical that we’re asking too much, that we’re doing more than is necessary. But frankly, that’s exactly what we intend.  When it comes to participant safety, overengineering of policies and procedures ought to be our goal.

One-Case Causes

August 27, 2013

One of the characteristics I look for in leaders is the ability and courage to ignore certain problems. To not get worked up about every little thing and even some bigger things. To stay focused on long-term goals and objectives in the midst of fad and frenzy. To distinguish the merely hot topics from the much more important topics.

“One-care causes” – projects or campaigns launched to address an isolated incident, even of high profile – can drain the resources and distract an organization from the larger and longer lasting issues that demand even more attention than we may be devoting to them.

We must not confuse one incident with a trend. We shouldn’t assume that an isolated situation demands an immediate solution, or that every single problem needs a top-down, systemic remedy.

Sometimes a problem – ineligibility, forfeit, unsportsmanlike act – really is limited to a particular student or school, or confined to a single coach, contest or community. And in those situations, leadership means leaving them alone and letting the matter be handled by people closer to those situations.