Overengineering
December 4, 2012
“Overengineering” is anathema to most product manufacturers. Generally, manufacturers desire to put no more time and money into a product than is necessary. They decide upon a reasonable lifespan for a product, and then they use materials and parts that, with rare exception, have been proven to last that long. They do not care to produce a product that lasts longer than the consumer desires; they do not want to invest resources where they won’t see a return.
An exception to this general rule is invoked by those manufacturing products which, if they break, will kill or maim people. Airplanes are the classic example: they’re built with multiple redundancies and with materials and parts that have been tested to last much longer than necessary. The potential for catastrophic loss of life demands this. They will use a part that’s tested to last 20 years, and replace it after ten years just to be safe.
I suspect that some observers of the MHSAA’s recent campaign to increase sports safety training for coaches and modify playing rules that may endanger participants are critical that we’re asking too much, that we’re doing more than is necessary. But frankly, that’s exactly what we intend. When it comes to participant safety, overengineering of policies and procedures ought to be our goal.
A Hot Topic
July 10, 2012
It is a terrible irony that Georgia saw two of its high school football players die late last summer when it’s the Georgia High School Association that was providing us with the best information we’ve ever had about the risks of heat illness and death.
The deaths occurred in the third year of a thorough three-year study in Georgia that is reinforcing common sense. The study is confirming who is most at risk and when they’re most at risk.
-
Who is most at risk? Linemen more than other players; underclassmen more than older players; those who have had the flu or similar sickness more than others.
-
When are they most at risk? During the season’s first week more than the second. During the second practice of a double session day more than the first. During the second half of the second practice more than the first half, and, early in the morning when humidity is often highest.
It all makes perfect sense: the chubby 9th or 10th grader during the second half of the second practice during the first week of the season. And because it’s statistically predictable, heat illness is almost entirely preventable.
There is some danger here in over-generalizing and over-simplifying, but awareness of these tendencies will help coaches to schedule and administrators to legislate around high-risk scenarios. We expect both will be happening in Michigan.