Pay to Play

July 28, 2015

Our local newspaper recently reported that a group of 8-year-olds had qualified for a national 3-on-3 soccer tournament July 31 to Aug. 2 at a theme park resort in Florida; but the report said the team had to raise $5,000 for the privilege.

Without knowing it at the time, the players and coaches qualified on the basis of a second-place finish at a tournament last August in Hastings, Michigan. Really? Second place? Last year?

Let’s be frank. The basis for qualifying for this national event in Florida was not a runner-up finish in a tournament for 7-year-olds the previous summer in a small town in Michigan. The basis for qualifying was the ability to raise $5,000 so the resort could fill its hotel rooms and sell tickets to its theme parks.

National tournament? Baloney. If you can pay, then you can play. Sell this as an expensive family trip, perhaps; but as a national tournament, it has zero integrity.

This kind of hype and hypocrisy adds to the challenges of administering sane and sensible school sports. Neither 8- nor 18-year-olds need national tournaments. There’s a lot more bang for the buck in our own backyards.

Panama Points

January 25, 2012

Author David Kord Murray opines in Borrowing Brilliance that almost all good ideas are borrowed, and the farther afield one roams from the topic at hand the more useful the idea may be (and the more brilliant it may appear to be).

So it didn’t surprise me to discover useful ideas for modern day leadership and management in a book written in the 1970s about a period many years before that – David McCullough’s history of the building of the Panama Canal titled The Path Between the Seas.

I learned first that the primary task of this huge project was not what it appears to be. It was not primarily an engineering feat, but medical. Not removing dirt, but disease. Not conquering the largest obstacles, but the smallest insects. It was only after the diseases were understood and controlled that the construction could advance and the project could be completed.

Second, I learned that once the construction was begun, there was a bigger challenge than digging the pathway clear. It was removing the unwanted dirt and debris to other places. It wasn’t the front end of the project alone that mattered, but the back end as well: where to put the hundreds of millions of tons of rock and dirt on or around this narrow isthmus of land.

For every project there is need to assess what the underlying issues are that might get in the way of accomplishing the more apparent tasks before us.

And for every project there is need to fully assess consequences. We don’t want merely to move the dirt around, creating new problems as we do so.

I will be considering these thoughts as I soon see with my own eyes the Panama Canal, constructed over four decades and completed almost 100 years ago. And gratefully, I will be fully immunized for diseases largely conquered during the completion of this engineering marvel.