Overengineering
December 4, 2012
“Overengineering” is anathema to most product manufacturers. Generally, manufacturers desire to put no more time and money into a product than is necessary. They decide upon a reasonable lifespan for a product, and then they use materials and parts that, with rare exception, have been proven to last that long. They do not care to produce a product that lasts longer than the consumer desires; they do not want to invest resources where they won’t see a return.
An exception to this general rule is invoked by those manufacturing products which, if they break, will kill or maim people. Airplanes are the classic example: they’re built with multiple redundancies and with materials and parts that have been tested to last much longer than necessary. The potential for catastrophic loss of life demands this. They will use a part that’s tested to last 20 years, and replace it after ten years just to be safe.
I suspect that some observers of the MHSAA’s recent campaign to increase sports safety training for coaches and modify playing rules that may endanger participants are critical that we’re asking too much, that we’re doing more than is necessary. But frankly, that’s exactly what we intend. When it comes to participant safety, overengineering of policies and procedures ought to be our goal.
Panama Points
January 25, 2012
Author David Kord Murray opines in Borrowing Brilliance that almost all good ideas are borrowed, and the farther afield one roams from the topic at hand the more useful the idea may be (and the more brilliant it may appear to be).
So it didn’t surprise me to discover useful ideas for modern day leadership and management in a book written in the 1970s about a period many years before that – David McCullough’s history of the building of the Panama Canal titled The Path Between the Seas.
I learned first that the primary task of this huge project was not what it appears to be. It was not primarily an engineering feat, but medical. Not removing dirt, but disease. Not conquering the largest obstacles, but the smallest insects. It was only after the diseases were understood and controlled that the construction could advance and the project could be completed.
Second, I learned that once the construction was begun, there was a bigger challenge than digging the pathway clear. It was removing the unwanted dirt and debris to other places. It wasn’t the front end of the project alone that mattered, but the back end as well: where to put the hundreds of millions of tons of rock and dirt on or around this narrow isthmus of land.
For every project there is need to assess what the underlying issues are that might get in the way of accomplishing the more apparent tasks before us.
And for every project there is need to fully assess consequences. We don’t want merely to move the dirt around, creating new problems as we do so.
I will be considering these thoughts as I soon see with my own eyes the Panama Canal, constructed over four decades and completed almost 100 years ago. And gratefully, I will be fully immunized for diseases largely conquered during the completion of this engineering marvel.